CLIENT: RESOLVE MARINA
PLACE: FONDEPORT BANDA C FISHING PIER, PTO MANZANILLO.
DURATION: 40 DAYS ON JUNE 13, 2013
PROJECT: TRANSFER, PLACEMENT, REVISION AND REMOVAL OF THE CONTAINER BARRIER FOR HYDROCARBON SPILLS AND COLLECTION OF FLOATING SOLIDS CONTAMINATED WITH HYDROCARBONS, FRONTAL FIRE ATTACK WITH TRAINED PERSONNEL (FIREFIGHTERS) ON THE TUNA VESSEL TERESA JANENE
DURATION: 1 YEAR IN 2013
PLACE:(PORT OF LAZARO, CARDENAS MICHOACAN)
PROJECT: ASSIST THE RUBBENS AND CROCODRILE DREDGER, WITH THE TRANSFER OF PERSONNEL BY SEA, SUPPLIES, SPARE PARTS, BATIMETRIES.
PLACE: PUERTO DE LAZARO CARDENAS MICHOACAN TUM III
DURATION: 9 MONTHS IN 2013.
PROJECT: TRANSFER, PLACEMENT, REMOVAL AND SUPERVISION OF THE YOKOHAMAS TYPE FENDERS, SO THAT THE SHIP HAD A MAXIMUM DISTANCE OF 5 MTS FROM THE DOCK WHEN IT WAS DOCKED SO THAT THE SHIP HAD A DEEPER DRAFT AND BE ABLE TO LOAD MORE TONS OF ORE THAN NORMAL.
PLACE: SECTION 07 PUERTO DE MANZANILLO, COLIMA. MEX.
DURATION: 15 DAYS IN 2014
PROJECT: ATTENTION TO OIL SPILLS (IFO) IN THE INTERIOR PORT SECTION NUMBER 7, TRANSFER, PLACEMENT AND REMOVAL OF THE BARRIER CONTAINING HYDROCARBON SPILLS, CLEANING OF THE SHIP, CLEANING OF THE QUAY FOLDER, CLEANING OF PILES, CLEANING OF DOCK SCREEN AND DEFENSES.
PLACE: MANZANILLO, COLIMA
DURATION: 48 HRS 2014.
PROJECT: ATTENTION TO THE OIL SPILL ON THE SHIP HANSA KIRKENES IN THE INNER PORT SECTION NUMBER 2, TRANSFER, PLACEMENT AND REMOVAL OF THE HYDROCARBON CONTAINER BARRIER COLLECTION OF OIL SPILLED INTO THE SEA, CLEANING OF THE SHIP, CLEANING DOCK.
PLACE: BARRA DE NAVIDAD, JALISCO
DURATION: 240 DAYS YEAR 2016
PROJECT:
TRANSFER, PLACEMENT, REVISION AND REMOVAL OF THE CONTAINER BARRIER FOR HYDROCARBON SPILLS AND COLLECTION OF FLOATING SOLIDS, CONTAMINATED WITH HYDROCARBONS, MANEUVERS WITH A MOORING BARGE IV AND HELICOPTER TO RAISE ABOARD THE VESSEL EQUIPMENT, TOOLS AND PERSONNEL FOR CLEANING AND SANITIZATION WORK , AS WELL AS, THE WORKS OF WEAKING THE HULL AND THE STRUCTURE.